| 1 |
| |
 |
|
| Windlass platform, 8 layers of carbon fiber provide the
base the stainless steel bow roller assembly will sit on. The Lewmar
rope/chain Ocean II with a capstan on the top, is duplicated on the starboard
side. |
|
|
|
| 2 |
| |
 |
|
| Templates being made for the Marble and Granite counter
tops. This real Marble is cut to about 1/8" and bonded to an Aluminum
honeycomb for strength and weighs in at 1 lb. lighter per square foot than
Corian or Avonite. |
|
|
|
| 3 |
| |
 |
|
| The forward heads being roughed in to facilitate
a pattern for counter tops |
|
|
|
| 4 |
| |
 |
|
| The material we are using here is also very light,
it consists of a honeycomb sandwich of vinyl on one side and in this case
an Ekome plywood on the outside. This will be epoxy primed and painted
with Dupont's Imron in this area. |
|
|
|
| 5 |
| |
 |
|
| Gen. set area being sound insulated, water maker
bracket installed on generator. This area also will hold the membranes
and filter system. |
|
|
|