Building a flush hatch drain system for the cockpit.
|
|
|
|
| 2 |
| |
 |
|
Teak flooring arrives as well as the Holly.
|
|
|
|
| 3 |
| |
 |
|
| Galley cabinets being formed from Tri-Cell honey
comb. These panels have white vinyl on one side and Teak on the other
and weigh 3 times less than solid plywood panels. |
|
|
|
| 4 |
| |
 |
|
Pivot block added for the
tilt up rudder assembly.
|
|
|
|
| 5 |
| |
 |
|
Laying out the toe kick part of the galley
|
|
|
|
| 6 |
| |
 |
|
Part of the galley and the bar have rounded ends.
|
|
|
|
| 7 |
| |
 |
|
| The starboard windlass mounting area being prepaired.
Port anchor system will be the same and electric Lewmar Ocean II rope/chain
windlasses on each side. |
|
|
|
| 8 |
|
 |
|
| The dash board area over the front bunk areas, will
have the sand blasted light panels set in to allow day light to come through
and privacy. |
|
|
|